Illustrasjoner, bilder og presentasjoner fra prosjektet E134 Oslofjordforbindelsen.

Bilder for viderebruk

Presentasjoner fra Leverandørkonferanse 14. juni 2021

Illustrasjonsfilmen viser den planlagte strekningen E134 Oslofjordforbindelsen. Video: Vianova.

 

English version

Construction stage 2 of the Oslo Fjord connection consists of adding a second barrel to the Oslo Fjord tunnel, running parallel to the existing barrel.

In addition, the road between the mouth of the tunnel at Måna and the E6 at Vassum will be extended to four lanes. The Vassum tunnel and the Frogn tunnel will be extended with a second barrel each, parallel to the existing barrels.

Construction stage 2 of the Oslo Fjord connection consists of adding a second barrel to the Oslo Fjord tunnel, running parallel to the existing barrel. In addition, the road between the mouth of the tunnel at Måna and the E6 at Vassum will be extended to four lanes. The Vassum tunnel and the Frogn tunnel will be extended with a second barrel each, parallel to the existing barrels. Video: Vianova.